[1]
Wibawa, I.G.S., Santiana, I.M.A., Wiraga, I.W., Arya, I.W., Surya Negara, D.R.S. and Yusuf, M. 2026. Time–cost trade-off analysis using the precedence diagram method in residential construction projects: A case study in Bali, Indonesia. International research journal of engineering, IT and scientific research. 12, 3 (May 2026), 25–35. DOI:https://doi.org/10.21744/irjeis.v12n3.2604.