[1]
Sulistiono, M.N.H. and Karim, R.A. 2026. Development of WBS (Work Breakdown Structure) standards on risk-based urban drainage projects to improve implementation time performance. International research journal of engineering, IT and scientific research. 12, 4 (Jul. 2026), 93–103. DOI:https://doi.org/10.21744/irjeis.v12n4.2613.