1.
Wibawa IGS, Santiana IMA, Wiraga IW, Arya IW, Surya Negara DRS, Yusuf M. Time–cost trade-off analysis using the precedence diagram method in residential construction projects: A case study in Bali, Indonesia. IRJEIS [Internet]. 2026 May 7 [cited 2026 May 9];12(3):25-3. Available from: https://sloap.org/journals/index.php/irjeis/article/view/2604